To build and operate a Peppercorn class A1 Pacific steam locomotive
Tornado's frames after unveiling at Darlington Works, 1997

Frames PDF Print E-mail

16th June 2008

Buffer set at I D Howitt Ltd, Crofton, June 2008The set of buffers has been completed at I D Howitt Ltd, Crofton Works ....

 

 

 

 

 

 

 

 Buffers fitted, June 2008.... and were fitted 20 June 2008.

 

 

 

 

 

 

 

 

27th May 2008

The cab and floor plates have been grit blasted and the interior has been finish painted in apple green in the sides and green on the inside of the roof. Andrew Daniel, the contract joiner who works for the LNERCA has made up and fitted the cab floor woodwork. Another day’s work remains to make the attachments to the steel floor.

22nd April 2008

Frames for spectacle windscreens fitted Apr 2008 - ready to receive 21mm thick glass!The cab front windscreens and side screens have been fitted (minus glass) and are awaiting fitting of catches which the Trust’s Anglia Support Group is delivering during the forthcoming Spring Covenantors’ Meeting. Glazing has been ordered from Romag. The pipe work and equipment has been stripped out in anticipation of painting. Further adjustment has been made to the front flange of the cab to make a better fit with the boiler cladding.

24th March 2008

The cab front window frames and side screen frames have been machined by an engineering company owned by a covenantor at a very reasonable price.

Romag has quoted for the glass, however in the mean time GKN Aerospace (Pilkington) has taken an interest and we are expecting a quote from them any day now.

19th January 2008

Cab front windscreen frame fitted April 2008 - shown openedWilliam Lane is in the process of casting the cab front window frames from patterns produced by Elsfield Patterns.

GN Steam continues with the modifications to the cab floor and under seat cubicles

20th December 2007

Quotes have been received the cab window frame patterns and castings. Contact has been re-established with Romag at Consett for the Group Standard compliant cab glazings. GN Steam is about to add access doors to the under seat cubicles and to modify the under-floor cubicle on the driver’s side to overcome a foul with the reversing bell crank/reversing rod pin assembly.

7th December 2007

Cab window frame patterns and castings are about to be ordered – the Trust’s East Anglia group of volunteers has agreed to make details and assemble them once the main window frames have been machined.

27th November 2007

Cab front windscreen frames received Jan 2008Quotes have been sought for the cab window frame patterns and castings.

 

 

 

 

 

 

 

16th July 2007

The lowering of the boiler onto the frames on 28th June has been a major milestone in the history of the project.

Coupled wheels showing green-painted backs

 

 

 

 

Painting between frames and outside frames behind wheels is complete, the coupled wheels have been taken back to metal, filled and primed and the undercoat has been applied to the backs of the wheels.

 

 

 

 

 

21st May 2007

Whilst lots of things are being installed and bolted onto the frames the most noticeable thing is that they are now in the process of being painted! Contractor GN Steam of Darlington are currently engaged in painting all the areas between the frames that will not be readily accessible once the boiler is lifted on:

Red paint between the framesBetween the frames, seen from cab

 

 

 

 

 

 

 

 

 

16th February 2007

Front air pump mounted between the framesThe centre stay has come back from North View Engineering and has been refitted to the frames, which has allowed us to mount the front air pump.

 

 

 

 

 

 

 

 

 

 

 

15th January 2007

Tornado's two air-pumps after testing on arrival in the UKTornado is to be fitted with twin air pumps and work proceeds on the mounting of these.

The rearmost of the two is now mounted in its final position

In order to mount the forward pump it has been necessary to remove one of the frame stays to modify it so as to be able to mount the pump. Work on this proceeds at North View Engineering in Darlington.

Star stay under modification at North View Engineering, Darlington


10th August 2006

The Cartazzi spring hangers have been fitted to the rear frames.

2nd July 2006

We continue to make progress on the frames. The left-hand side footplating is complete and our volunteer team will now start work on the right-hand side.