Progress continues on many fronts at Darlington Locomotive Works (and elsewhere) in the race to assemble
Prince of Wales. In the following photos, Daniela can be seen working on the CAD of the cylinder end covers, the Cartazzi axleboxes are assembled on the axle and then fitted, two 08 shunter speedometer drives are prepared for re-working and components of the two newly acquired air pumps are checked before dispatch to Meiningen. All photos by David Elliott.