As ever, a lot of small jobs need to be done to keep the larger work online so here a few photos by Daniela Filová of work in progress at Darlington Locomotive Works:
Terry Graham and James Heginbottom drilling BR1 brake blocks.
Steve Wood performing an hydraulic test on the cylinder drain cock castings prior to machining.
Ian Matthews machining off weld on the handrail end.
The left hand Slide bar bracket ready to be inspected.